AREA of concern

HAD update 

My reply

UP stream

the slope to the north of House No. 100 in the Village,

The Lands Department (LandsD) carried out maintenance works on the bare surfaces of slopes numbered 7SE-A/C70 and 7SE-A/C71 in October 2025

Thank you for your report and assistance


According to CEDD, no signs of landslide were observed in the concerned slope area at the time of inspection, and there was no immediate or obvious danger to the stability of the slopes. Emergency slope repair works were therefore not considered necessary at this stage.

Pls consider the factor of soil erosion as one of the major causes of flooding at the footpath near house 87 D, was the huge amount of sand and topsoil was washed down during the heavy rain period

The pic above is self-explanatory. Pls carry out coverage of the slope accordingly.

The 

Food and Environmental Hygiene Department (FEHD) conducted a site inspection on 21 February 2026.  Its cleansing contractor cleared the abandoned wooden planks and other refuse at the site.  FEHD will continue to monitor the situation closely and take further appropriate action as necessary to maintain public health standards

Thank you very much for the arrangement

Mid Stream

The area near House No. 87F in the Village, STDO, is still exploring the feasibility of the proposed drainage works, with related departments, to alleviate the flooding risk in the area

STDO is still exploring the feasibility of the proposed drainage works, with related departments, to alleviate the flooding risk in the area

I would suggest HAD to carry out works at the government land first to avoid the prolonged delay of action due to the recovery of land from our neighbour

Down stream

The drainage issue near the lamppost no. BE2200

Clearance work has been carried out.

Sorry, I did not agree that clearance work was completed, as I still discovered a huge amount of mud and soil accumulated in the downstream, and the hillside drainage still accumulates a huge amount of broken trees and rocks

 

Please kindly arrange for staff to tidy up  the drainage channel before the rainy season, and consider breaking the wall and freeing up space for the machine to access the drainage to clear up the soil and mud