202508 Interim propose work to avoid recurrent flood at lok lo ha village near Jubilee villa
1. Rebuilt the bridge outside house 87D to increase clearance for water to pass from 2
feet to at least three feet.
2. Rebuilt a short bridge near house 97 to allow a minimal clearance of two feet to avoid
any flooding of the footpath at black rainstorm
3. Re-provision of the dog bit around the corner leading to house 97 so that a concrete
box of rain water drainage can be built to increase the capacity of rain water exit to
the main drainage pipe in the figure. If possible a branch should be built to bring rain
water to the right of the figure where there is another main drainage pipe
4. Bring down this wall to allow DSD staff to access the drainage channel at its back to
clear up sand and rubbish. Stop planting vegetation at the left side to allow villager to
access the drainage canal with ease to clear up rubbish and sand and mud.